
Upstream · Services
Integrated oilfield services
From seismic to the pump, under a single contract: eight integrated oilfield services — geosciences, drilling, completion, site construction, surface facilities, integrity & robotics, produced water, O&M. One point of contact, one end-to-end responsibility.
Targets of a company in formation — not achieved results.
Talk to an E&P expert →Browse this page · 6 themes
Where to start
According to your field’s phase.
E&P operators · Where to start?
Three ways in, depending on your need.
The Exploration & Production catalogue is vast — choose the door that matches your situation: your field phase, a family of services, or a specific intervention. At any time, the configurator prices your scope.
Looking to rent equipment or drilling tools? EnerTchad operates integrated oilfield services — crews, equipment and tools mobilised under a service contract, not dry rental.
See our packs →Become a client →Exploration & Production · Solutions by field phase
Five packs, one field phase each.
Every field has its age and its urgencies. Five pre-assembled scopes, to refine in the configurator — each pack opens the configurator already set to your phase. (indicative envelopes · company in formation) EnerScope™, EnerBuild™, EnerRun™, EnerRevive™ and EnerClose™ — like EnerCamp™, EnerSupply™ and EnerSkills™ for site support — are trademarks in preparation of EnerTchad S.A.: service scopes at target stage, named so they can be asked for simply.
Exploration & Production · Dedicated mature-fields offer
Mature fields: making the barrel’s second life produce.
Doba has produced since 2003; decline and water (water cut > 85%) are now the basin’s daily reality — yet 2 to 3× the volume already produced still sleeps in place. Our mature-fields service line attacks this dormant resource through five integrated levers. (target offer · company in formation)
An aligned commercial model: on the EOR pilot, payment is tied to the verified additional barrel — the operator pays for the result, not the promise. Discuss a mature field →
The service catalogue
The interventions in detail, and who carries them.
From earthworks to the pump — eight integrated services, three site-support lines.
EnerTchad targets an oilfield-services (OFS) task force covering the whole well cycle, under a single contract. A single point of contact means fewer interface costs, repeated mobilisations and cascading margins — the barrel produced at lower cost. Click each service: detail + a costed use case. (ambition · company in formation)
① Study & de-risk
Understanding the reservoir before investing.
Learn more
- Seismic acquisition and reprocessing.
- Coring, mud logging and wellsite geology.
- Static and dynamic reservoir models.
Challenge — Investing in a poorly characterised reservoir means risking dry wells and wasted capital.
Integrated answer — Re-interpretation of public data and targeted seismic before any heavy spend.
Targeted gainCapital committed only where de-risked — fewer dry wells
② Develop the field
Preparing the ground before the first metre drilled.
Learn more
- Earthworks, well pads, mud pits and dykes.
- All-weather access roads, crossings and site fencing.
- Oilfield civil works: well cellars, rig foundations, camps.
Challenge — Without an accepted pad and a passable road, the drilling rig waits — and every waiting day is paid at a premium.
Integrated answer — Construction capacity built into the OFS contract: the wellpad is ready, HSE-compliant, when the rig arrives — and the site is restored at end of life.
Targeted gainMobilisation without dead time · restoration included
Reaching the resource, safely.
Learn more
- Directional drilling and well programmes.
- Drilling fluids, mud and cuttings management.
- Real-time operations monitoring.
Challenge — Mobilising driller, fluids and monitoring through three separate contracts multiplies delays and margins.
Integrated answer — Drilling, fluids and real-time monitoring united under a single EnerTchad contract.
Targeted gainFewer interface costs · faster mobilisation
Bringing wells on line — and back on line.
Learn more
- Completions tailored to each well.
- Rehabilitation of existing wells.
- Stimulation to revive flow.
Challenge — Flying in a workover crew from abroad for every well is costly and wastes time.
Integrated answer — A local intervention crew: rehabilitate and stimulate rather than drill new.
Targeted gainProduction revived at a fraction of the cost of a new well
③ Produce & maintain
Designing the facilities before the first barrel.
Learn more
- Early production facilities (EPF): produce early, learn the field, fund what comes next.
- Sizing the oil-water-gas separation train to GOR, water cut and the viscosity of Chad’s heavy crude.
- Treating the crude (BS&W < 0.5%), produced water and associated gas; storage, metering and flowlines.
- Connection to the modular mini-refineries and the evacuation corridor.
Challenge — Fixed facilities, sized for a theoretical plateau, tie up capital — or strangle production as soon as the water rises.
Integrated answer — Facilities engineering fed by reservoir data (GOR and water profiles) and built in movable modules: capacity follows the field.
Targeted gainFirst barrel earlier, capex phased over the field’s real life
Inspecting without stopping production.
Learn more
- Inspection drones, pigs and crawlers.
- Corrosion and fatigue monitoring.
- Safety and availability of the assets.
Challenge — Stopping production to inspect means lost revenue.
Integrated answer — In-line inspection by drones, pigs and crawlers — without an operations shutdown.
Targeted gainAvailability preserved · maintenance predictive rather than endured
Managing water, a sensitive resource.
Learn more
- Water separation and treatment.
- Reinjection and recycling (target).
- Environmental compliance.
Challenge — Treating then disposing of produced water is a heavy cost item and a compliance risk.
Integrated answer — On-site treatment, reinjection and recycling (target) — water valorised, not disposed of.
Targeted gainWater-management cost reduced · compliance held
Operating for the long haul.
Learn more
- Site operations and maintenance.
- Production optimisation.
- Maximum asset availability.
Challenge — Multiplying contractors on the same field scatters responsibility and inflates the operating budget.
Integrated answer — Integrated operations and maintenance from the well to the facilities, one Chadian contact accountable for the result.
Targeted gainO&M budget controlled · maximum availability targeted
+ Site support — cross-cutting
Housing, feeding and powering the site — far from everything.
Learn more
- Modular camps: accommodation, catering, drinking water, effluent treatment.
- Hybrid gas-solar site power and telecom / VSAT links.
- Personnel transport, rotations and site security.
Challenge — In Chad, an isolated site without a reliable camp loses crew hours every day — and drives away the best people.
Integrated answer — A turnkey camp built into the OFS contract, run by trained local teams.
Targeted gainCrews focused on the well · rotations under control
The critical part, at the right time, despite being landlocked.
Learn more
- Sourcing and import: the Douala–N’Djamena corridor, customs and transit mastered.
- Pooled critical stocks: tubulars, cement, chemicals, spare parts.
- Local content: qualifying and upskilling Chadian suppliers.
Challenge — A landlocked country: one missing part can idle a drilling rig for weeks.
Integrated answer — A dedicated supply chain, strategic in-country stocks and a network of qualified suppliers.
Targeted gainLogistics downtime reduced · foreign currency kept in the country
Qualified Chadian crews, on your site.
Learn more
- Tchaditude academy: well trades, HSE and operations curricula.
- Job shadowing and progressive certification of the operator’s teams.
- Simulators and on-site mentoring.
Challenge — Depending on expatriates for every key position is costly — and builds nothing lasting.
Integrated answer — Every OFS contract carries a training component: your teams upskill while the service is delivered.
Targeted gainExpatriation costs reduced · skills that stay in the country
Standards targeted for service delivery: API Spec Q2 (quality for oilfield-service organisations), ISO 29001 (oil & gas sector QMS) and NORSOK D-010 (well integrity & barriers).
Everything presented here is a target or ambition of a company in formation — not assets in operation.
Exploration & Production · Well-intervention lines
The intervention catalogue, line by line.
Beyond the big families, here are the well-intervention service lines EnerTchad aims to operate — wireline, slickline, coiled tubing, stimulation, cementing, fishing… Each under the single OFS contract: one point of contact, fewer mobilisations, the barrel produced at lower cost. Click a line: technical detail + a costed use case. (ambition · company in formation)
Measuring the reservoir and perforating, on electric line.
Learn more
- Open-hole & cased-hole logging: porosity, saturation, cement bond (CBL/VDL).
- Perforating the productive zones (e-line / TCP).
- Downhole sampling and pressure measurements.
Challenge — Diagnosing a well by bringing in a heavy drilling rig is costly and loses weeks.
Integrated answer — A wireline unit built into the OFS contract, scheduled with the campaign’s other interventions.
Targeted gainOne heavy mobilisation avoided per campaign · faster decisions
Routine well servicing, light and fast.
Learn more
- Setting/pulling plugs, downhole valves and chokes (gauges).
- Tubing drift runs and cleaning (drift, scraper).
- Memory pressure and temperature surveys.
Challenge — Routine operations idle the well too long when the crew comes from far away.
Integrated answer — A local, responsive slickline crew, no heavy rig, under the same contract.
Targeted gainProduction downtime cut to hours rather than days
Circulating in the well under pressure, without killing it.
Learn more
- Bottomhole cleanout and nitrogen kick-off.
- Acidising and targeted fluid placement.
- Light milling and continuous circulation.
Challenge — Reviving a plugged well often demands a heavy, costly workover.
Integrated answer — Coiled tubing + nitrogen mobilised under the single contract, the well kept under pressure.
Targeted gainProduction restored without a heavy workover · shutdown days saved
Reopening the reservoir’s drains.
Learn more
- Matrix acidising (carbonates and sandstones).
- Light hydraulic fracturing, calibrated to small fields.
- Deposit treatments (scale, paraffin, asphaltenes).
Challenge — Flow declining through formation damage slowly condemns the well.
Integrated answer — Diagnosis + calibrated stimulation, local chemical inputs (natron/neem) where possible.
Targeted gainProductivity index lifted · additional barrels at low capital
Isolating zones, securing the well.
Learn more
- Primary casing cementing.
- Cement plugs and remedial squeezes.
- Quality control by logging (CBL/VDL).
Challenge — Failed isolation lets water or gas in and threatens well integrity.
Integrated answer — Cementing and quality control united in the same intervention.
Targeted gainWater cut controlled · well integrity assured
Recovering what was left downhole.
Learn more
- Recovering stuck tools or cables (overshot, spear).
- Milling “fish” and clearing the well.
- Incident diagnosis and a recovery plan.
Challenge — A tool lost downhole can condemn the well and force a costly sidetrack.
Integrated answer — A fishing workshop mobilised under the same contract, no emergency tender.
Targeted gainWell saved · sidetrack avoided
Measuring what the well can really deliver.
Learn more
- DST and production tests: flow, pressure, PVT samples.
- Separation and controlled / metered flaring.
- Interpretation serving the development plan.
Challenge — Deciding on a development without reliable data means committing capital blind.
Integrated answer — An integrated test campaign linked to the EnerConseils Atlas for interpretation.
Targeted gainDevelopment decision de-risked · capex better allocated
Intervening under pressure, safely.
Learn more
- Snubbing (under-pressure intervention) on a live well.
- Kick control and well control.
- Securing before and after the intervention.
Challenge — Working on a pressurised well without a dedicated crew is risky and often subcontracted far away.
Integrated answer — Snubbing and well-control capacity built into the local OFS force.
Targeted gainSafety reinforced · intervention without killing the well
Bringing the barrel up when the reservoir no longer pushes.
Learn more
- Beam pumps, electric submersible pumps (ESP) and progressive cavity pumps (PCP).
- Gas-lift where associated gas allows.
- Sizing, installation, monitoring and optimisation of the systems.
- Powering the pumping: hybrid gas-solar site power to squeeze the power bill — see the story “the autonomous field”.
Challenge — On a mature field, natural pressure declines: without suitable lift, the well produces a fraction of its potential.
Integrated answer — Selecting and operating the right lift system per well — installed, monitored and optimised under the OFS contract.
Targeted gainProduction sustained on a mature field · cost per barrel controlled
Closing a well cleanly, down to the last day.
Learn more
- Compliant cement plugs and isolation barriers.
- Cutting, wellhead recovery and surface decommissioning.
- Site restoration and a documented end-of-life file.
Challenge — A badly abandoned well is an environmental and legal liability that outlives its operator by decades.
Integrated answer — Integrated P&A capacity: the well cycle is managed from wellpad construction to certified abandonment.
Targeted gainLiability controlled · end-of-life compliance · sites left clean
The well’s lifeblood: density, rheology, filtrate — kept in the lab.
Learn more
- Water-based mud design and monitoring suited to the reactive clays of Chadian basins.
- Continuous control: density, viscosity, filtrate, salinity — mobile lab at the wellpad.
- Cuttings management and closed loop, aligned with produced-water management.
Challenge — A poorly kept mud sticks the string and costs days of rig time.
Integrated answer — Fluids line integrated in the OFS contract, specialists mobilised under EnerTchad project management (integrated line · see scope).
Targeted gainRig days saved · trajectories held · cuttings controlled
Steer the trajectory and measure while drilling.
Learn more
- Steered trajectories to reach targets from a single wellpad — smaller footprint.
- Measurement while drilling (MWD) and logging while drilling (LWD): engineering decides in real time.
- Trajectory-reservoir coordination with our geosciences and the digital field.
Challenge — Multiplying pads and vertical wells makes every barrel dearer in a landlocked area.
Integrated answer — Directional specialists contracted and supervised by EnerTchad, from well programme to final report (integrated line · see scope).
Targeted gainSeveral targets per wellpad · reduced footprint · better-read reservoir
An intervention model designed for the client.
Four principles structure every assignment — from the one-off job to the multi-year framework contract. (target model · company in formation)
One contact for all eight services: fewer interface costs, repeated mobilisations and cascading margins.
Built with proven partners on the open blocks — each capability brought by the one who masters it.
On EOR, EnerTchad can be paid on the verified additional barrels — the client’s risk is capped.
Barrel calculator →HSE golden rules on every site and priority to Chadian talent — the next generation trained before extracting.
Three services, told from the field.
An integrated force
Every service draws on our poles
EnerTchad’s oilfield services are not a silo: they mobilise the whole house’s capabilities — robotics, water, chemistry, data, recovery and integrity — united under a single contract.
Continue in Exploration & Production
Specialised lines
Geoscience, interventions, operations, digital.
Exploration & Production · Geosciences & laboratory
Understanding the reservoir before committing the first franc.
An EOR programme or a marginal-block restart begins in the laboratory, not on site. EnerTchad targets a complete geosciences chain — from the core to the Field Development Plan — carried out in Chad, to de-risk each of the operator’s investment decisions. (ambition · company in formation)
Coring, slabs, porosity-permeability, wettability, saturation — the base data that calibrates models and EOR screening on the Doba and Bongor sandstones.
Deliverables: core report · k/φ curves · petrophysical databasePVT analyses, viscosity of 21-24° API heavy crudes, water-EOR chemistry compatibility (natron, neem, CSS) — a Chadian petroleum laboratory targeted, no more six-week shipments abroad.
Deliverables: PVT report · fluid sheets · compatibility testsLog interpretation, static model, flow simulation, P10/P50/P90 uncertainties — the production forecast that holds up before an investment committee.
Deliverables: static & dynamic model · P10/P50/P90 profilesA phased Field Development Plan (FDP), project economics, a 1P/2P/3P reserves file ready for certification — and for the regulator.
Deliverables: FDP · reserves file · barrel economicsTarget: a marginal-field FDP in 6 to 10 weeks, data and models remaining the operator’s property — contributed to theSector atlas only with their consent.
Exploration & Production · Advanced interventions
The lines that complete the catalogue.
Beyond the twelve intervention lines, four advanced capabilities targeted for wells that demand more — sand, long-duration testing, non-destructive testing, downhole diagnostics.
Screens, packers and gravel pack, chemical consolidation — supply, installation and monitoring: securing production from unconsolidated sandstones without prematurely choking the well.
Mature fields · ageing completionsMulti-rate tests, controlled ramp-up, PLT — quantifying a well’s real potential before committing to full development.
Mobile 3-phase separator · zero flaring targetedUltrasonics, magnetic-particle, dye-penetrant and radiographic testing on wellheads, gathering lines and tanks — the non-destructive testing that extends facility life.
Complements robotic inspection (drones, pigs, crawlers)Memory slickline, pressure-temperature profiles, identifying unwanted water or gas — the diagnosis that precedes every return to production.
The systematic entry point of lift & EOR programmesExploration & Production · Production operations
The field’s operations, held daily.
Between two interventions, a field lives: integrity, chemistry, water, shutdowns. EnerTchad offers these recurring operations as an integrated service — the ones that make the difference between an asset that lasts and an asset that declines.
Wellhead and annulus diagnostics, corrosion-erosion monitoring, barriers and pressure tests: extending well life without compromising safety.
Periodic inspections · integrity filesParaffins, mineral deposits, emulsions, corrosion: injection programmes, flow assurance and laboratory monitoring to keep wells and gathering lines clean.
Local inputs preferred · natron, neemSeparation, treatment and reinjection of produced water — environmental compliance and reservoir pressure maintenance, in a short loop with EOR.
Zero non-compliant discharge targetedPlanned shutdowns, regulatory inspections, restart: planning and work permits to make shutdown days rare and short.
Operational HSE · work permitsExploration & Production · Digital field services
The digital field, serving your operations.
The L1-L4 digital backbone of TchadiTech is not reserved for EnerTchad assets: it is offered to operators as a service — from the valve to the dashboard.
A control centre in N’Djamena targeted: real-time well monitoring, alarms, on-call duty — fewer rounds, incidents seen before they cost.
Delegated operations or in support of your teamsSensors, hybrid gas-solar transmission, historian: putting wells and gathering lines designed before the data era under telemetry.
Sovereign L1-L4 architecture · data in ChadA digital twin of the gathering network, production allocation, material balance — the end of unexplained gaps between wellhead and point of sale. See the real-time SCADA dashboard and the story “the digital field”.
The basis of EOR success-based paymentProduction-HSE-cost dashboards, a data room ready for partners and authorities — monthly reporting produced in days, not weeks.
Interoperable with the sector AtlasWhy a Chadian oilfield-services arm
The economic case, and the field notes.
OFS · The economic equation
Why a Chadian oilfield-services company changes the cost of the barrel.
In an oil project, most of a well’s cost goes to services — and in landlocked Chad, every service mobilised from abroad pays twice: the service, then the logistics and the waiting. A task force based at the worksite attacks both terms of the equation.
of a well’s cost typically goes to oilfield services and equipment — that is where the competitiveness of a Chadian barrel is won or lost.
of international mobilisation avoided when the crew, tooling and parts are already in N’Djamena or on the basin — waiting for a tool is often more expensive than the tool.
non-productive time (NPT) shrinks when diagnosis, intervention and spare parts are a few hours of track away — not a charter flight and a border away.
integrated OFS removes cascading margins and interface costs between subcontractors: one contact, one responsibility, one price.
The cost-reduction specialists — because we develop local content.
An intervention base at the worksite, Chadian personnel trained by the academy, inputs sourced in-country — from Kanem natron to cotton cellulose. Every localised link removes freight, foreign currency and weeks of waiting: the same service, delivered at the field, structurally costs less — and the value stays in Chad.
For an E&P operator, it is also local content documented contract by contract under the Chadian Petroleum Code: our procurement policy gives bonus scoring to bids from Chadian-registered companies, sizes lots to stay within reach of local SMEs, and builds HSE and quality capability with Tchaditude — the traceability your compliance teams expect.
Six phases, one point of contact.
Our eight services chain across a well’s whole life — here is who does what, phase by phase.
Studies, dossiers & de-risking
Sector Atlas, registry data, dossier assembly — Advisory & Atlas (EnerConseils).
Sites, wellpads & all-weather access
Earthworks, pads, roads, camps — Site & wellpad construction, before the first metre drilled.
Well testing and bringing on line
Slickline, testing, gauging, well cleanout — Well interventions, from the first test to the first barrel.
Lift, diagnosis, return to production
Wireline, pumps, lift optimisation, wellhead maintenance — the heart of Interventions, backed by the sensors TchadiTech.
Flow, metering, data
Corridor, SCADA, custody metering, digital twins — Logistics & integrity + Technology & data, up to EOR preparation.
Plug & abandonment (P&A)
Cementing, cut and retrieve, site restoration — end of life is part of the contract, not a blind spot.
Specialised “frac tank”-type containers from the moment the well starts up.
From a well’s tests and clean-up flow — even before the permanent facilities — the crude is captured in specialised, adapted containers inspired by frac tanks: high-capacity mobile tanks, set on dedicated containment, connected in series on the wellpad and movable by truck.
A double function: spill protection around operations (containment, confined transfers, nothing on the ground) and immediate commercial recovery — every test barrel is stored, measured and evacuated instead of burnt or lost. The well pays from the day it starts up.
The right tank, at the right well, at the right time.
Six families of mobile containers cover every moment of the well’s life, from the first test barrel to long-distance evacuation — all sit on containment, connect in series and leave by road.
Mobile three-phase separator
The prerequisite of all capture: a containerised skid separates gas, crude and water at the wellhead — a heater-treater (heater-treater) for heavy crudes, metering at the outlet. The crude leaves on spec (BS&W < 0.5%) to the tanks, the water to treatment, the gas is measured instead of flared.
Towable 500 bbl frac tank
The wellpad’s workhorse: a corrugated-wall steel tank on skids, integrated rear axle. Connected in series on containment, opening roof, optional heating coils for paraffinic crudes. Moved empty from well to well.
Road-approved frac tank trailer
Same capacity, mounted as a multi-axle semi-trailer: it captures test crude for weeks on containment, then leaves directly by road for the mini-refinery. Axle load to validate against track conditions.
130 bbl vacuum truck
An onboard vacuum pump: it draws directly from the well cellar, containment bottoms and test tanks, with no external pump. The “zero barrel lost” tool — drips, clean-up flow, loaded fluids. Fast rotation.
Hook-lift skip
A sealed hook tank, set and retrieved in minutes by a standard hook-lift truck: one carrier serves several wells, full skips settle on site. Cut out for marginal wells in re-entry.
26 m³ ISO tank container
A stainless tank in a 20-foot container frame: twist-locks, double valve, flame arrestors. Moves from road chassis to flatbed truck, even to rail — the long-distance evacuation option to the refinery or export.
Towable double-wall tank
A small tank with built-in containment on a light trailer, towable by pick-up and movable full at low speed on the pad. The buffer for the very first barrels of a well test, at the test separator outlet.
A mobile three-phase separator at the head (the right crude on spec, water and gas diverted), two 500 bbl frac tanks connected in series on containment (main storage), a 130 bbl vacuum truck in rotation (active recovery and evacuation), two to three hook-lift skips for satellite wells, a double-wall tank for the initial test phase.
Common specifications: heating coils (paraffinic crudes), vents with flame arrestors, reinforced ground clearance and sand tyres, foldable soft containments that travel with the equipment.
Read the analysis: early production, converting time into capital →
What we do in-house, what we integrate.
An honest catalogue states its scope. Ours distinguishes the lines held by our own crews and equipment from those we integrate from specialists — always under our project management, one point of contact, one HSE-Q standard.
Civil works for sites and all-weather wellpads · surface operations and field maintenance · light interventions (slickline, wireline) · well testing and mobile separation · produced-water management · landlocked logistics and specialised fleet · local EOR chemistry (EnerChimie) and the digital field (TchadiTech).
Directional drilling and measurement while drilling (MWD/LWD) · specialised drilling fluids · cementing and casing · heavy drilling and workover rigs · occasional specialist services — selected, contracted and supervised by EnerTchad. (targeted scope · company in formation)
Workover units, 150–350 HP, matched to well depths in the Doba and Bongor basins, with associated pumping and nitrogen — the mechanical heart of the mature-fields service. Heavy drilling rigs remain an integrated line, under our project management. (targeted range · company in formation)
Four contract models, one non-negotiable HSE-Q foundation.
Systematic work permits, LOTO lockout, stop-work authority for every worker, pre-task risk analyses, a bridging document aligned with the operator’s standard. Well barriers and kick control: BOPs tested on schedule, well-control drills, IWCF/IADC certification targeted for all personnel on pressurised operations. ISO 9001 · 14001 · 45001 approach targeted, HSE reporting shared with the client. (targeted framework · company in formation)