Execution · The integrated oil chain
Our projects, from the forgotten barrel to the pump.
Eight flagship projects, staged and de-risked step by step, structure EnerTchad’s ramp-up — each linking several poles, from the additional barrel to the pump. A legible investment trajectory: dated objectives of a company in formation, from the short term to the 2030+ horizon.
Our flagship projects
The projects, pole by pole.
Each pole portal keeps the list of the projects it leads — the direct reading, link by link.
What these projects aim to bring the country.
Dated targets, in the service of energy sovereignty: produce, refine and distribute Chadian oil — and retain its value in Chad. Company in formation; volumes and deadlines are targeted objectives.
E&P intervention force & consortia
Mobilise oilfield-services teams and build consortia on the open blocks of the 2025 cadastre.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
EOR pilots · mature fields
Enhanced recovery with local inputs (natron, neem) at Doba and Bongor: the barrel asleep in the rock.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Doba–Kribi export corridor
Make better use of the under-loaded pipeline: every additional barrel lowers the whole corridor’s unit tariff.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Tchadium + Mobile Stations™
Approved stations and containerised units to open up mines, worksites and rural areas — at the ARSAT price.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Modular mini-refineries
Satellite units to refine here rather than import, operated 24/7 through AI and robotics.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Water-to-Value™
Treatment and valorisation of produced water: reinjection and a zero-discharge objective.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Fertiliser from Sédigui gas
Ammonia, urea and NPK from Sédigui gas — the priority chemical chain, serving agricultural security.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
Hybridisation & micro-grids
Gas + battery on sites, pay-as-you-go village micro-grids and EV charging points — Chad’s geography serving renewables.
- Implementation conditions
- Permits, financing, partnerships and technical validation specific to the project.
- Progress evidence
- Published 2026 progress update (French PDF)
How we run a project: five rules
Eight flagship projects, one discipline. Whatever its size, every EnerTchad project follows the same rules of conduct — that is what lets a compact team carry an ambitious portfolio.
Phase, always
No project is committed as one block: short stages, each with its deliverable and its exit point — we can slow down or stop without wrecking the whole.
Finance in steps
Each stage cleared unlocks the next: capital is exposed progressively, at the pace of demonstrated results — never on the strength of a plan alone.
Build with the country
Local firms supervised, Chadian skills trained on the job: local content is not a box to tick, it is a project deliverable.
Measure impact, not activity
Kilometres laid, jobs created, litres delivered, hectares irrigated: every project has its outcome indicators — being busy is not moving forward.
Report, regularly
Progress, spend, incidents, variances: every project publishes its status at fixed intervals — partners’ trust is built by the regularity of the reporting.
Project progress — published status
Public information reviewed on 8 October 2026. The following requirements are conditions to document before progressing, not a claim that work has started. No completion percentage is shown without supporting evidence.
| Project | Published status | Next condition to document | Public materials |
|---|---|---|---|
| E&P intervention force & consortia | Target — not operational | Consortium agreements and scope | 2026 update Public documents |
| EOR pilots · mature fields | Target — not operational | Pilot protocol and field access | 2026 update Public documents |
| Doba–Kribi export corridor | Target — not operational | Access agreements and logistics studies | 2026 update Public documents |
| Tchadium + Mobile Stations™ | Target — not operational | Studies, approvals and locations | 2026 update Public documents |
| Modular mini-refineries | Target — not operational | Feasibility, approvals and financing | 2026 update Public documents |
| Water-to-Value™ | Target — not operational | Treatment studies and HSE requirements | 2026 update Public documents |
| Fertiliser from Sédigui gas | Target — not operational | Feasibility and access to gas | 2026 update Public documents |
| Hybridisation & micro-grids | Target — not operational | Site studies and economic model | 2026 update Public documents |