ATLAS · EnerTchad

Infrastructure and operations

Explore export infrastructure, crude characteristics and operating conditions.

6

Infrastructure & export

Export rests on the Doba–Kribi pipeline, about 1,070 km long (of which ~170 km on Chadian territory), commissioned in 2003 — operated by TOTCO on the Chadian side and COTCO on the Cameroonian side. SHT holds 40% of TOTCO; fiscal metering (LACT, Coriolis meters ±0.05%) certifies transfers at Doba, Komé and Kribi. The crude is loaded off Kribi (Cameroon) via the Komé–Kribi 1 floating terminal. Refining & Distribution, the Djermaya refinery (SRN, 20 kb/d nominal, ~14 kb/d actual), commissioned in 2011 with CNPC, remains the country’s only refining site.

Doba · KoméFields & gatheringKomé PS1Pumping stationDompta PS2Pumping stationBelabo PS3Pumping stationKribiPressure-reduction stationKomé–Kribi 1 FSO · 12 km offshore~170 km in Chad~900 km in Cameroon

Swipe the map sideways to follow the whole route, from Doba to Kribi.

Doba → Kribi

Length
1,070 km
Chad section
~170 km
Diameter
30" (762 mm)
Capacity
~225 kb/d
Commissioned
2003
Operators
TOTCO · COTCO
  • Chad
  • Cameroon
  • Pipeline
  • Station

Stations and terminal: COTCO, Cameroon transportation system.

Doba–Kribi pipeline· 1,070 km (≈170 km in Chad)· 30" · ~225 kb/d · 2003· operated by TOTCO (Chad) & COTCO (Cameroon) — EnerTchad is not its operator.
Table 4 — Main infrastructure
InfrastructureTypeCapacity / LengthIn service
Doba–Kribi pipelineExport (Chad→Cameroon)~1,070 km · ~225 kb/d2003
Komé–Kribi 1 FSO terminalOffshore storage / loading2.4 Mb2003
Ronier–Djermaya pipelineDomestic crude300 km2011
Djermaya refinery (SRN)Refining20 kb/d2011

A Chad–Algeria framework agreement to study a second 20 kb/d refinery was signed in April 2026, to strengthen coverage of domestic needs.

◆

Crude technical sheet (Doba Blend)

The input datum of any downstream operation: the crude’s profile. Doba Blend is heavy, sweet, but marked by strong naphthenic acidity — which dictates unit metallurgy more than sulphur does.

Indicative Doba Blend profile — public assays
Source fieldsKomé · Miandoum · Bolobo (Doba basin)
Density≈ 21° API — a heavy crude
Sulphur≈ 0.10% m — doux (sweet)
Acid number (TAN)high — naphthenic acids (narrows the refiner base)
Calcium250 – 350 ppm
Stake no. 1Naphthenic corrosion → alloyed metallurgy, no major H₂S problem

Indicative values varying by batch/blend date. Sources: Chevron/Texaco assays (Oil & Gas Journal), ESMAP.

◆

Operations support networks

No operation stands without its support networks. Here are those Chadian operations depend on — with their real status: the sector’s are operational, EnerTchad’s own remain targets.

Doba–Kribi export pipeline
1,070 km (~170 km in Chad) · TOTCO/COTCO
Operational
Ronier–Djermaya pipeline
≈ 300 km · feeds the refinery
Operational
Djermaya refinery (SRN)
20 kb/d nominal
Operational
Road network & crude trucking
National corridors · hub-and-spoke
Partial · EnerTchad target
Power grid
Limited national coverage (SNE)
Target: gas-solar self-generation
Water (boreholes / aquifers)
Site-dependent, Sahelian zone
Target: closed loop
SCADA / telecoms
Real-time asset supervision
Target: L1–L4 control
◆

Gas & safety — H₂S and associated gas

Doba crude is sweet, but H₂S remains an operating risk — associated gas, confined spaces, and reservoir souring induced by water injection / EOR. Heavier than air, it accumulates in low points.

H₂S — concentration & effect (NIOSH/OSHA references)
ConcentrationEffect / benchmark
0.01 – 0.1 ppmOdour threshold (rotten egg) — not to be relied on
10 ppmRecommended exposure limit (NIOSH REL)
20 ppmOSHA ceiling
100 ppmIDLH — immediate danger; olfactory paralysis
500 ppmRapid loss of consciousness
≥ 1000 ppmImmediate collapse, one to two breaths
PropertiesDensity 1.19 (heavier than air) · flammable (LEL 4.3% – UEL 46%).
BarriersFixed + portable detection, SCBA/PPE, evacuation plans, H₂S training, souring surveillance.

Reference frame: NIOSH Pocket Guide, OSHA 1910.1000. Target of a company in formation.

◆

Climate & operating windows

In Chad, the calendar commands the operations. Drilling, crude transport and worksites are planned around the dry season; the rains and the harmattan dictate buffer stocks and maintenance.

Rainy season (south)
May → October
Tracks impassable, logistics slowed
Dry season (south)
November → April
Drilling window & heavy transport
Harmattan (Sahel/north)
December → February
Dust: visibility, filters, maintenance
Extreme heat
March → May
>40 °C: HSE constraints, equipment derating